Real challenges. Tangible outcomes. Enduring value.

Proven systems delivering measurable efficency.

Every project tells a story: of challenges met, systems optimised, and performance enhanced.
At CALL3D, our portfolio highlight how know-how, creativity, and precision come together to deliver measurable value for airports and logistics operators worldwide.

Our approach in action

N

Feasibility to Implementation:

From early studies to final delivery, our projects showcase our ability to support clients across every stage.

N

Collaborative Work:

Partnering with engineers, architects, and stakeholders to ensure alignment and seamless execution.

N

Tailored Solutions:

Each work reflects solutions designed to meet unique requirements rather than one-size-fits-all approaches.

N

Sustainable Outcomes:

Projects designed not just for immediate success but for long-term efficiency, reliability, and adaptability.

Below is a representative selection of projects that illustrate the breadth and diversity of CALL3D’s expertise. These examples highlight collaborations with major international airports, system integrators, and logistics providers across Europe, Asia, and the Middle East.

CDG Paris Charles de Gaulle – BHS design schemes for TDS3 and TBS4 (2015-2016), extending the original TBE concept design first developed in 1999 by Jérôme Guernier in support of Mannesmann Dematic (later acquired by Siemens)

LHR London Heathrow – Terminal 1, 2, 3, 4, & 5 baggage handling schemes, feasibility, and upgrade designs (2013-2022)

MXP Milan Malpensa – Scheme design improvement for delivery and Check-in extension project (multiple phases, 2008–2010)

DWC Dubai World Central Al Maktoum International Airport – Overall BHS design (2017-2018)

PEK Beijing Capital International Airport – T2 & T3 EBS Expansion and BHS replacement optionering (2020)

SZX Shenzhen Airport – New overall baggage system option based on 100% ICS solution from check-in to make-up (2023)

MAN Manchester Airport – T2 & T3 Standard 3 upgrade concept review and optionering (2017)

CALL3D: Engineering results that stand the test of time.

CALL3D Consulting for Airports & Logistics
develops advanced handling solutions worldwide.

CALL3D di Jérôme Guernier

Registered address:
Via E. Reinach 6
20159 Milano MI
Italy

✉️ info@call3d.net

Multilingual service available in English, French, and Italian.

© CALL3D 2025 All rights reserved  | Third-party content (e.g. YouTube, TikTok) remains the property of its respective owners. | VAT/P.IVA IT11356270964 | Privacy policy | Cookie Policy